View a Resource's Detailed Time

Through Eclipse work planner, project managers can easily check the detailed time of any assigned resource.

To view the detailed time of a resource

  1. Open the required work planner.
  2. At the lower part of the work planner page, in the left-hand side section of the Resource Sheet tab, click the action arrow next to the required resource.
    A drop-down menu of various actions is displayed.

  1. From the drop-down menu, click Detailed Time.
    The Detailed Time page opens.

  1. At the top of the window, click Options.
    A drop-down list is displayed.

  1. On the drop-down list,
    1. Under Periods, select the radio button next to the preferred period.
    2. Under Units, select the radio button next to the preferred unit.
    3. Under Sort By, select the radio button next to the preferred sorting option.
    4. Click Apply.
      The Detailed Time page refreshes automatically displaying the data as per the selected options.
  1. On the Detailed Time page, drag the 2 green handles back-and-forth, to select the time frame you need to display its details.

Tip: To check the detailed time of another resource, at the top of the grid, click Resources and select the required resource(s).

Tip: To filter the displayed tasks of the selected resource(s), at the top of the grid, click Task and select All Tasks, Complete Tasks or Incomplete Tasks, as required.

  1. After checking the data, click OK to close the Detailed Time page.